Photo of the Sexsmith elevator after much of the restoration was done to the only elevator left in Sexsmith, Alberta. It had a new roof installed and was re-painted. Windows are to be replaced and cleaning of the inside scheduled for 2022 with the complete restoration is hoped to be completed in 2024 or 2025.
DiscoverThePeaceCountry.com